Installed power requested INCLUDING the first electric installation Select the total power required for the stand
CONNECTION PROCEDURES
Electric systems at stands must be installed in conformity to Italian Ministerial Decree 22/01/2008 and CEI (Italian Electric Standards Committee) specifications.
Installations not in compliance with the above mentioned specifications and without the submission by the Exhibitor of the the mandatory forms "Statement of correct execution of the electric system and set-up" and "Statement of conformity of the electric system," will not be connected the power grid by Bolognafiere Officially authorized electricians, (for electrical system installed by non-italian companies the exhibitor must request to BolognaFiere the "Verification of compliance of the electrical system" at his own expenses).
Electric systems at stands must be installed in conformity to Italian Ministerial Decree 22/01/2008 and CEI (Italian Electric Standards Committee) specifications.
Installations not in compliance with the above mentioned specifications and without the submission by the Exhibitor of the the mandatory forms "Statement of correct execution of the electric system and set-up" and "Statement of conformity of the electric system," will not be connected the power grid by Bolognafiere Officially authorized electricians, (for electrical system installed by non-italian companies the exhibitor must request to BolognaFiere the "Verification of compliance of the electrical system" at his own expenses).
To install this Web App in your iPhone/iPad press and then Add to Home Screen.