True

FOR EXCEEDING BUILDING MATERIAL LINKED TO SR036

1.00 € 1.00 € 1.0 EUR

1.00 €

(0% Off)

Cod: SR037


ask for quotation to vendite@bolognafiere.itrichiedi un preventivo a vendite@bolognafiere.it
Days
Hours
Mins
Secs

    This combination does not exist.



    Description

    LITTERING AND WASTE AND SET-UP/DISMANTLING MATERIALS REMOVAL
    If waste and all other exhibition and set-up materials are not removed by the deadline indicated in 2.C (for the stand set-up phase) as by the dates indicated in the table “FINAL DEADLINES FOR CLEARANCE OF EXHIBITION CENTRE” in point 2. D of the Exhibition Technical Regulations (for the dismantling phase), BolognaFiere will automatically send the waste to the waste disposal or treatment plants. In this case the Exhibitor will be required to pay all direct and indirect expenses incurred for clearance and disposal/treatment, in addition to a penalty ranging from € 2,500.00 to € 15,000.00 (from two thousand five hundred euro/00 to fifteen thousand euro/00) as shown in the following table:

    Quantity Fine price
    cubic meters

    from 1 to 3 m3 € 2.500,00
    from 3,5 to 6 m3 € 5.000,00
    from 6,5 to 10 m3 € 10.000,00
    More than 10 m3 € 15.000,00
    as well as reimbursement for any additional damages. The Organiser will also have the right to bar the Exhibitor from future participation in the Exhibition.


    LITTERING AND WASTE AND SET-UP/DISMANTLING MATERIALS REMOVAL
    If waste and all other exhibition and set-up materials are not removed by the deadline indicated in 2.C (for the stand set-up phase) as by the dates indicated in the table “FINAL DEADLINES FOR CLEARANCE OF EXHIBITION CENTRE” in point 2. D of the Exhibition Technical Regulations (for the dismantling phase), BolognaFiere will automatically send the waste to the waste disposal or treatment plants. In this case the Exhibitor will be required to pay all direct and indirect expenses incurred for clearance and disposal/treatment, in addition to a penalty ranging from € 2,500.00 to € 15,000.00 (from two thousand five hundred euro/00 to fifteen thousand euro/00) as shown in the following table:

    Quantity Fine price
    cubic meters

    from 1 to 3 m3 € 2.500,00
    from 3,5 to 6 m3 € 5.000,00
    from 6,5 to 10 m3 € 10.000,00
    More than 10 m3 € 15.000,00
    as well as reimbursement for any additional damages. The Organiser will also have the right to bar the Exhibitor from future participation in the Exhibition.


    To install this Web App in your iPhone/iPad press and then Add to Home Screen.